Emergency treatment project for upstream water purification of Dongfanghong Sluice

Release time: 2025-03-26
 Number of visits: 1

Project scale: 10000m ³/d.

Process technology: Ultra magnetic separation integrated equipment.

Execution standard: The effluent quality is required to meet the Class IV water standard of the Environmental Quality Standards for Surface Water (GB3838-2002).

Recommended Posts

No data

  • Back to Top