Deodorization Project of Hangzhou Chengxi Domestic Waste Transfer Station

Release time: 2025-03-26
 Number of visits: 2

Project location: Xihu District, Hangzhou

Processing technology: The front-end adopts an "ion fresh air system+space atomization deodorization system", and the end adopts a "chemical washing+plant liquid washing+activated carbon adsorption" process (where the combination of chemical washing and plant liquid washing is an integrated purification equipment)

Processing items: Methyl sulfide, Methyl mercaptan, Trimethylamine, Carbon disulfide, Styrene NH3、 H2S and other components

Project scale: Processing air volume of 280000 m ³/h

Recommended Posts

No data

  • Back to Top